What is a dormer loft conversion?

A dormer loft conversion adds a box-shaped structure to the rear roof slope, creating vertical walls and full headroom across most of the new room. It is the most common loft conversion in the UK because it works on terraced, semi-detached and detached houses.
How much does a dormer loft conversion cost in Caldicot?
In Caldicot, a dormer loft conversion typically costs £44,000–£62,500 for a typical rear dormer with en-suite, including VAT at 20% (standard rate). We start from a UK-wide guide and adjust it for Wales, where labour and materials are typically about 8% below average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A typical rear dormer with en-suite | £44,000–£62,500 |
| Higher specification | £62,500–£78,000 |
The biggest cost drivers are:
- Scaffolding and access
- En-suite or bathroom
- Dormer size and roof structure
- Staircase position
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a dormer loft conversion in Caldicot?
The approval route for Caldicot is set by planning law in Wales. In Wales roof enlargements such as rear dormers can be permitted development within volume limits and design conditions. Dormers facing a road, balconies and conservation-area work need permission.
The Party Wall etc. Act 1996 applies in Wales, so notices must be served before work on a shared wall, on the boundary, or excavation close to a neighbour’s foundations.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
What we take care of:
- Measured survey and head-height check
- Building control completion certificate
- Dormer structure, roof covering and windows
- Insulation, plastering, electrics and plumbing
- New staircase and fire-safe escape route
- Drawings and structural calculations
How long does it take?
Expect 6 to 9 weeks on site. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Caldicot
Terraced houses in Welsh towns often have narrow plots, which suits rear and side return extensions and rear dormers.
Caldicot sits in Gwent, about 10 miles east of Newport. We cover the whole of Caldicot, including postcodes NP26.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about dormer loft conversions in Caldicot
What fire safety is required?
Building regulations require a safe escape route. Converting a two-storey house to three storeys usually means a protected stairway with fire doors to habitable rooms and mains-wired smoke alarms.
Will I need to move out?
No. Most of the work is done from scaffolding and the roof. The new staircase is formed near the end, which causes a few days of disruption.
How much does a dormer loft conversion cost in Caldicot?
In Caldicot, a dormer loft conversion typically costs £44,000–£62,500 for a typical rear dormer with en-suite, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
How much head height do I need?
Ideally at least 2.2 metres from the top of the ceiling joists to the underside of the ridge. Less can still work with a dormer, but we check this at the survey.
Do I need planning permission for a dormer loft conversion in Caldicot?
In Wales roof enlargements such as rear dormers can be permitted development within volume limits and design conditions. Dormers facing a road, balconies and conservation-area work need permission.
How long does a dormer loft conversion take in Caldicot?
Typically 6 to 9 weeks on site. Design and approvals beforehand usually take 6 to 12 weeks.