SK Developments Free home visit0800 088 6248 Get a quote

Argyll and ButeHouse renovations

House renovations in Dunoon

We take on house renovations in Dunoon, about 38 miles south-east of Oban, handling the drawings, approvals and construction so you deal with one company throughout.

Guide price in Dunoon

£850–£1,750 per m² for a medium to full renovation

In Dunoon, a house renovation typically costs £850–£1,750 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £76,500–£157,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a house renovation?

Renovated Victorian living room with a restored fireplace, sash windows and pine floorboards

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.

How much does a house renovation cost in Dunoon?

In Dunoon, a house renovation typically costs £850–£1,750 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £76,500–£157,500. Island and remote projects usually cost more than this guide because of shipping, travel and accommodation. Design, structural calculations and council fees are extra.

Guide prices for Dunoon, including VAT at 20% (5% may apply to homes empty for two years or more)
Size or typeGuide range
Smaller project (63 m²)£53,500–£110,000
Typical project (90 m²)£76,500–£157,500
Larger project (126 m²)£107,000–£220,500
Rate per m²£850–£1,750

The biggest cost drivers are:

  • Kitchens and bathrooms
  • Extent of rewiring and replumbing
  • Finishes
  • Structural and damp repairs

Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.

Do you need planning permission for a house renovation in Dunoon?

Whether you need planning permission depends on your house and its location in Scotland. In Scotland internal alterations such as structural changes or new bathrooms may need a building warrant, and listed homes need listed building consent.

Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.

Our first visit includes a check of your planning history, so you know the route before paying for drawings.

What we handle

From survey to sign-off, the job normally involves:

  • Structural repairs and damp treatment
  • Condition survey and scope of works
  • Rewiring and heating upgrades
  • Kitchens and bathrooms
  • Plastering and boarding
  • Decoration

How long does it take?

Expect 8 to 20 weeks on site depending on scope. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.

Building in Dunoon

Scotland’s housing ranges from sandstone tenements and villas to post-war and modern estates, and the building warrant system shapes how projects are planned.

Because Dunoon is a long way from the main centres, we confirm availability before quoting and list any travel costs separately.

How it works

  1. 01

    Survey and brief

    We visit, discuss your ideas and budget, and survey the property or site at no cost.

  2. 02

    Drawings and written quote

    We prepare the design and give you a written, itemised quote with inclusions and exclusions.

  3. 03

    Approvals in place

    We handle planning, building control and neighbour notices before work starts.

  4. 04

    Build and handover

    Work follows the agreed programme, with inspections along the way and a completion certificate at the end.

Questions about house renovations in Dunoon

Does a renovation need building regulations approval?

Some parts do, such as rewiring, structural changes, new windows and heating systems. We handle notifications.

Do I need planning permission for a house renovation in Dunoon?

In Scotland internal alterations such as structural changes or new bathrooms may need a building warrant, and listed homes need listed building consent.

Is VAT reduced on renovations?

Usually not; the standard 20% rate applies. A reduced 5% rate can apply when renovating a home that has been empty for at least two years.

How long does a house renovation take in Dunoon?

Typically 8 to 20 weeks on site depending on scope. Design and approvals beforehand usually take 6 to 12 weeks.

Do you renovate listed buildings?

Yes, with listed building consent and appropriate materials.

How much does a house renovation cost in Dunoon?

In Dunoon, a house renovation typically costs £850–£1,750 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £76,500–£157,500. Your fixed price depends on the survey and drawings.

Get a free, no-obligation home visit for your house renovation in Dunoon.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price