What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in Edinburgh?
In Edinburgh, a house renovation typically costs £850–£1,750 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £76,500–£157,500. Building costs in Scotland are close to the UK average, so the figures for Edinburgh are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £53,500–£110,000 |
| Typical project (90 m²) | £76,500–£157,500 |
| Larger project (126 m²) | £107,000–£220,500 |
| Rate per m² | £850–£1,750 |
What moves the price most:
- Kitchens and bathrooms
- Whether you live in during the work
- Finishes
- Extent of rewiring and replumbing
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a house renovation in Edinburgh?
Before anything is built in Edinburgh, we confirm which approvals apply in Scotland. In Scotland internal alterations such as structural changes or new bathrooms may need a building warrant, and listed homes need listed building consent.
Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
From survey to sign-off, the job normally involves:
- Building control for notifiable work
- Structural repairs and damp treatment
- Condition survey and scope of works
- Plastering and boarding
- Joinery, doors and floors
- Kitchens and bathrooms
How long does it take?
Expect 8 to 20 weeks on site depending on scope. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Edinburgh
In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.
We cover the whole of Edinburgh.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about house renovations in Edinburgh
Do I need planning permission for a house renovation in Edinburgh?
In Scotland internal alterations such as structural changes or new bathrooms may need a building warrant, and listed homes need listed building consent.
Can I live in the house during a renovation?
For light work, yes. For a full renovation, most clients move out for some or all of the job.
Do you renovate listed buildings?
Yes, with listed building consent and appropriate materials.
How much does a house renovation cost in Edinburgh?
In Edinburgh, a house renovation typically costs £850–£1,750 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £76,500–£157,500. Your fixed price depends on the survey and drawings.
Does a renovation need building regulations approval?
Some parts do, such as rewiring, structural changes, new windows and heating systems. We handle notifications.
How long does a house renovation take in Edinburgh?
Typically 8 to 20 weeks on site depending on scope. Design and approvals beforehand usually take 6 to 12 weeks.