What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in Lewisham?
In Lewisham, a house renovation typically costs £1,150–£2,350 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £103,500–£211,500. The guide for Lewisham reflects typical costs in London, roughly 30% above the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £72,500–£148,000 |
| Typical project (90 m²) | £103,500–£211,500 |
| Larger project (126 m²) | £145,000–£296,000 |
| Rate per m² | £1,150–£2,350 |
What moves the price most:
- Whether you live in during the work
- Structural and damp repairs
- Windows and doors
- Finishes
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a house renovation in Lewisham?
Whether you need planning permission depends on your house and its location in England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
From survey to sign-off, the job normally involves:
- Joinery, doors and floors
- Rewiring and heating upgrades
- Building control for notifiable work
- Condition survey and scope of works
- Kitchens and bathrooms
- Structural repairs and damp treatment
How long does it take?
Build time is typically 8 to 20 weeks on site depending on scope. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Lewisham
Space is at a premium in London, so homeowners often build out into the side return or up into the roof rather than move.
We work across Lewisham and neighbouring areas such as Forest Hill, Catford and Peckham. Postcodes we cover in Lewisham include SE13 and SE22.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about house renovations in Lewisham
Do you renovate listed buildings?
Yes, with listed building consent and appropriate materials.
How long does a house renovation take in Lewisham?
Typically 8 to 20 weeks on site depending on scope. Design and approvals beforehand usually take 6 to 12 weeks.
How much does a house renovation cost in Lewisham?
In Lewisham, a house renovation typically costs £1,150–£2,350 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £103,500–£211,500. Your fixed price depends on the survey and drawings.
Can I live in the house during a renovation?
For light work, yes. For a full renovation, most clients move out for some or all of the job.
Is VAT reduced on renovations?
Usually not; the standard 20% rate applies. A reduced 5% rate can apply when renovating a home that has been empty for at least two years.
