SK Developments Free home visit0800 088 6248 Get a quote

ScotlandNew build homes

New build homes in Edinburgh

Planning a new build home in Edinburgh? We survey, design, handle the approvals and build, with building control sign-off at the end.

Guide price in Edinburgh

£1,950–£3,100 per m² of floor area (build cost)

In Edinburgh, a new build home typically costs £1,950–£3,100 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £292,500–£465,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a new build home?

Newly completed contemporary detached house in brick, render and timber cladding

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.

How much does a new build home cost in Edinburgh?

In Edinburgh, a new build home typically costs £1,950–£3,100 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £292,500–£465,000. Building costs in Scotland are close to the UK average, so the figures for Edinburgh are close to our national guide. Design, structural calculations and council fees are extra.

Guide prices for Edinburgh, including VAT at 0% (zero-rated for qualifying new dwellings)
Size or typeGuide range
Smaller project (105 m²)£205,000–£325,500
Typical project (150 m²)£292,500–£465,000
Larger project (210 m²)£409,500–£651,000
Rate per m²£1,950–£3,100

The biggest cost drivers are:

  • Specification and energy systems
  • Size and complexity of the house
  • Site access and demolition
  • Services connections

Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.

Do you need planning permission for a new build home in Edinburgh?

Whether you need planning permission depends on your house and its location in Scotland. In Scotland a new home needs planning permission and a building warrant before work starts.

In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.

If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.

What we handle

Handled as part of most new build homes:

  • Groundworks, foundations and drainage
  • Superstructure, roof and windows
  • Internal fit-out and finishes
  • Design and planning application
  • Building control completion and warranty liaison
  • Site appraisal and feasibility

How long does it take?

Expect 9 to 14 months on site for a typical house. Design and approvals come first and typically take 4 to 9 months, depending on the approval route.

Building in Edinburgh

Scotland’s housing ranges from sandstone tenements and villas to post-war and modern estates, and the building warrant system shapes how projects are planned.

We cover the whole of Edinburgh.

How it works

  1. 01

    Visit and measured survey

    A free visit to understand the project, check access and take measurements.

  2. 02

    Drawings and written quote

    We prepare the design and give you a written, itemised quote with inclusions and exclusions.

  3. 03

    Approvals

    Planning or permitted development confirmation, building regulations and any party wall matters.

  4. 04

    Build and handover

    Work follows the agreed programme, with inspections along the way and a completion certificate at the end.

Questions about new build homes in Edinburgh

How long does a new build take?

A typical house takes 9 to 14 months on site after approvals.

How much does a new build home cost in Edinburgh?

In Edinburgh, a new build home typically costs £1,950–£3,100 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £292,500–£465,000. Your fixed price depends on the survey and drawings.

Is Community Infrastructure Levy payable?

In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.

Do I need planning permission for a new build home in Edinburgh?

In Scotland a new home needs planning permission and a building warrant before work starts.

Who approves a new build home in Edinburgh?

Planning matters in Edinburgh go to the council covering your address, and the work needs a building warrant. We prepare and submit the applications for you.

Is VAT charged on building a new house?

Construction services for a new dwelling are normally zero-rated when supplied by a VAT-registered builder. Self-builders who buy materials directly can reclaim VAT through HMRC’s DIY housebuilders scheme.

Ready to talk about a new build home in Edinburgh? Book a free home visit or get an instant guide price.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price