What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Edinburgh?
In Edinburgh, a small housing development typically costs £1,750–£2,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £700,000–£1,040,000. Building costs in Scotland are close to the UK average, so the figures for Edinburgh are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £490,000–£728,000 |
| Typical project (400 m²) | £700,000–£1,040,000 |
| Larger project (560 m²) | £980,000–£1,456,000 |
| Rate per m² | £1,750–£2,600 |
What moves the price most:
- Specification
- Ground conditions
- Planning conditions and obligations
- Roads, sewers and adoption agreements
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a small housing development in Edinburgh?
The approval route for Edinburgh is set by planning law in Scotland. In Scotland small schemes need planning permission, building warrants for each home and, where new roads are built, roads construction consent.
In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.
We check this for your address before design work starts, so there are no surprises later.
What we handle
The work we manage on a small housing development:
- Groundworks, roads and drainage
- Utility connections
- House construction to building regulations
- Pre-construction cost plan
- Design development and discharge of conditions
- Warranty and building control inspections
How long does it take?
The build itself usually takes 12 to 24 months depending on scheme size. Allow time beforehand for drawings and approvals, usually 6 to 12 months.
Building in Edinburgh
In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.
We cover the whole of Edinburgh.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about small housing developments in Edinburgh
Do you work with landowners?
Yes. If you own land, with or without planning permission, we can discuss building on it with you.
Who approves a small housing development in Edinburgh?
Planning matters in Edinburgh go to the council covering your address, and the work needs a building warrant. We prepare and submit the applications for you.
Is VAT charged on new homes?
Construction of qualifying new dwellings is normally zero-rated for VAT.
How much does a small housing development cost in Edinburgh?
In Edinburgh, a small housing development typically costs £1,750–£2,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £700,000–£1,040,000. Your fixed price depends on the survey and drawings.
Do I need planning permission for a small housing development in Edinburgh?
In Scotland small schemes need planning permission, building warrants for each home and, where new roads are built, roads construction consent.
Who handles road adoption?
We build roads and sewers to adoptable standards where agreements are in place with the highway authority and water company.