SK Developments Free home visit0800 088 6248 Get a quote

CambridgeshireOrangeries

Orangeries in March

SK Developments designs, gets approval for and builds orangeries in March and across Cambridgeshire, with one contract from the first drawing to the building control sign-off.

Guide price in March

£2,550–£3,600 per m² of floor area

In March, an orangery typically costs £2,550–£3,600 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £41,000–£57,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is an orangery?

Brick orangery with white French doors, glazed panels and a central roof lantern at sunset

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.

How much does an orangery cost in March?

In March, an orangery typically costs £2,550–£3,600 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £41,000–£57,500. We start from a UK-wide guide and adjust it for the East of England, where labour and materials are typically about 6% above average. Design, structural calculations and council fees are extra.

Guide prices for March, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (11 m²)£28,000–£39,500
Typical project (16 m²)£41,000–£57,500
Larger project (22 m²)£56,000–£79,000
Rate per m²£2,550–£3,600

The biggest cost drivers are:

  • Heating and flooring
  • Frame material and colour
  • Opening into the house
  • Size and shape of the footprint

A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.

Do you need planning permission for an orangery in March?

The approval route for March is set by planning law in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.

What we handle

Handled as part of most orangeries:

  • Foundations and dwarf walls or piers
  • Electrics, heating and plastering
  • French, sliding or bifold doors
  • Flooring and decoration options
  • Roof lantern and glazed panels
  • Design to suit the style of the house

How long does it take?

Expect 8 to 12 weeks on site. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.

Building in March

Many towns in the East of England have estates built since the 1970s, where garage conversions and rear extensions are popular.

Projects in March (PE15) are surveyed in person before we quote, so the price reflects your actual property.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Drawings and written quote

    We prepare the design and give you a written, itemised quote with inclusions and exclusions.

  3. 03

    Approvals

    Planning or permitted development confirmation, building regulations and any party wall matters.

  4. 04

    Build and sign-off

    We run the build to a written programme and hand over the completion certificate.

Questions about orangeries in March

How long does it take?

Typically 8 to 12 weeks on site once approvals are in place.

How much does an orangery cost in March?

In March, an orangery typically costs £2,550–£3,600 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £41,000–£57,500. Your fixed price depends on the survey and drawings.

Does an orangery need planning permission?

The same rules as a single-storey extension apply. Many are permitted development, depending on depth, height and your house’s location.

Do you build orangeries in March?

Yes. We build orangeries across March, including postcodes PE15. Every project starts with a free home visit.

Can it be used all year?

Yes. With an insulated roof, efficient glazing and heating, an orangery is comfortable all year.

Tell us about your project in March and we will arrange a free home visit.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price