What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in County Tyrone?
In County Tyrone, a small housing development typically costs £1,550–£2,300 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £620,000–£920,000. Building costs in Northern Ireland run about 14% below the UK average, and the figures for County Tyrone are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £434,000–£644,000 |
| Typical project (400 m²) | £620,000–£920,000 |
| Larger project (560 m²) | £868,000–£1,288,000 |
| Rate per m² | £1,550–£2,300 |
What moves the price most:
- Planning conditions and obligations
- Site access and phasing
- Specification
- Roads, sewers and adoption agreements
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a small housing development in County Tyrone?
The approval route for County Tyrone is set by planning law in Northern Ireland. In Northern Ireland small schemes need planning permission and building control approval, with road adoption agreed with DfI Roads where relevant.
In Northern Ireland building control approval comes from the council, usually through a full plans application or a building notice, with inspections during the work and a completion certificate at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
Handled as part of most small housing developments:
- Handover packs for each home
- Pre-construction cost plan
- House construction to building regulations
- Design development and discharge of conditions
- Utility connections
- External works and landscaping
How long does it take?
Build time is typically 12 to 24 months depending on scheme size. Design and approvals come first and typically take 6 to 12 months, depending on the approval route.
Building in County Tyrone
Northern Ireland has many detached and semi-detached homes on generous plots, which suits single-storey rear extensions and garage conversions.
Towns we cover in County Tyrone include Omagh, Strabane, Dungannon and Cookstown.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about small housing developments in County Tyrone
Do you build small housing developments in County Tyrone?
Yes. We build small housing developments across County Tyrone, including postcodes BT68, BT69, BT70, BT71 and BT75. Every project starts with a free home visit.
Do I need planning permission for a small housing development in County Tyrone?
In Northern Ireland small schemes need planning permission and building control approval, with road adoption agreed with DfI Roads where relevant.
How much does a small housing development cost in County Tyrone?
In County Tyrone, a small housing development typically costs £1,550–£2,300 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £620,000–£920,000. Your fixed price depends on the survey and drawings.
Can you help with planning?
Yes. We coordinate the architect or designer and, where needed, a planning consultant.
Is VAT charged on new homes?
Construction of qualifying new dwellings is normally zero-rated for VAT.
Who handles road adoption?
We build roads and sewers to adoptable standards where agreements are in place with the highway authority and water company.