What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Flint?
In Flint, a small housing development typically costs £1,650–£2,500 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £660,000–£1,000,000. Prices across Wales are typically 8% below the UK average for this kind of work, which is reflected in the range for Flint. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £462,000–£700,000 |
| Typical project (400 m²) | £660,000–£1,000,000 |
| Larger project (560 m²) | £924,000–£1,400,000 |
| Rate per m² | £1,650–£2,500 |
The biggest cost drivers are:
- Roads, sewers and adoption agreements
- Specification
- Planning conditions and obligations
- Number and size of homes
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a small housing development in Flint?
Whether you need planning permission depends on your house and its location in Wales. In Wales small schemes need full planning permission and, for most new buildings, sustainable drainage approval from the SuDS approval body. New homes must have sprinklers.
Building regulations in Wales are set by the Welsh Government. Approval comes from the council’s building control service or a registered building control approver, with inspections during the work and a completion certificate at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
The work we manage on a small housing development:
- Groundworks, roads and drainage
- Utility connections
- Design development and discharge of conditions
- House construction to building regulations
- Handover packs for each home
- Warranty and building control inspections
How long does it take?
Allow 12 to 24 months depending on scheme size. Before that, surveys, drawings and approvals usually take 6 to 12 months, longer if the council asks for changes.
Building in Flint
Wales has many terraced valley streets, stone cottages and post-war estates, so extension designs are shaped by slopes, materials and local character.
Projects in Flint (CH6) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about small housing developments in Flint
Do you build small housing developments in Flint?
Yes. We build small housing developments across Flint, including postcodes CH6. Every project starts with a free home visit.
Is VAT charged on new homes?
Construction of qualifying new dwellings is normally zero-rated for VAT.
How much does a small housing development cost in Flint?
In Flint, a small housing development typically costs £1,650–£2,500 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £660,000–£1,000,000. Your fixed price depends on the survey and drawings.
Do I need planning permission for a small housing development in Flint?
In Wales small schemes need full planning permission and, for most new buildings, sustainable drainage approval from the SuDS approval body. New homes must have sprinklers.
How long does a small development take?
Typically 12 to 24 months on site, depending on size and phasing.
Do you work with landowners?
Yes. If you own land, with or without planning permission, we can discuss building on it with you.