CambridgeshireStructural alterations and knock-throughs

Structural alterations and knock-throughs in March

Thinking about a structural alteration in March? We can take it from first ideas to finished, signed-off work, with a written programme before work starts.

Guide price in March

£4,750–£10,000 for a typical knock-through with steel beam

In March, a structural alteration typically costs £4,750–£10,000 for a typical knock-through with steel beam, including VAT at 20% (standard rate).

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a structural alteration?

Steel beam installed across a wide opening with props in place during a knock-through

A structural alteration changes how a house carries its loads, most often by removing a load-bearing wall and replacing it with a steel beam. It is how kitchens and dining rooms become open-plan, and how extensions are joined to the original house.

How much does a structural alteration cost in March?

In March, a structural alteration typically costs £4,750–£10,000 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Prices across the East of England are typically 6% above the UK average for this kind of work, which is reflected in the range for March. Design, structural calculations and council fees are extra.

Guide prices for March, including VAT at 20% (standard rate)
Size or typeGuide range
A typical knock-through with steel beam£4,750–£10,000
Higher specification£10,000–£12,500

The main things that change the cost:

  • Flush or downstand beam
  • What sits above the wall
  • Party wall involvement
  • Floor and ceiling repairs

For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.

Do you need planning permission for a structural alteration in March?

The approval route for March is set by planning law in England. In England removing a load-bearing wall does not need planning permission but does need building regulations approval with an engineer’s calculations. If the beam bears on a party wall, a party wall notice must be served.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

We check this for your address before design work starts, so there are no surprises later.

What we handle

On a typical structural alteration we handle:

  • Temporary propping
  • Making good, plastering and flooring repairs
  • Fire protection to the steel
  • Steel beam supply and installation on padstones
  • Party wall notices where needed
  • Building control sign-off

How long does it take?

The build itself usually takes 1 to 2 weeks on site for a typical knock-through. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.

Building in March

Many towns in the East of England have estates built since the 1970s, where garage conversions and rear extensions are popular.

If your home is in March or close by in Wisbech, Ely and Peterborough, a free home visit is the first step.

How it works

  1. 01

    Survey and brief

    We visit, discuss your ideas and budget, and survey the property or site at no cost.

  2. 02

    Design and fixed quote

    Drawings, structural calculations and an itemised, fixed price for the agreed specification.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Build and sign-off

    We run the build to a written programme and hand over the completion certificate.

Questions about structural alterations in March

Do I need a party wall notice?

In England and Wales, if the beam sits in a party wall, yes.

What fire protection does a steel need?

Usually fire-rated plasterboard or intumescent paint, as building control requires.

How long does a structural alteration take in March?

Typically 1 to 2 weeks on site for a typical knock-through. Design and approvals beforehand usually take 6 to 12 weeks.

Do I need building regulations approval?

Yes. Removing a load-bearing wall is building work that needs approval, with calculations for the beam.

How much does a structural alteration cost in March?

In March, a structural alteration typically costs £4,750–£10,000 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.

Tell us about your project in March and we will arrange a free home visit.

Call 0800 088 6248 or get an instant guide price online.