What is a basement conversion?

A basement conversion turns an existing cellar into living space, or excavates a new basement under the house or garden. Waterproofing, structural support and daylight are the main design challenges.
How much does a basement conversion cost in March?
In March, a basement conversion typically costs £2,000–£3,400 per m² for converting an existing cellar, including VAT at 20% (standard rate). For a typical 30 m² project that is roughly £60,000–£102,000. Prices across the East of England are typically 6% above the UK average for this kind of work, which is reflected in the range for March. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (21 m²) | £42,000–£71,500 |
| Typical project (30 m²) | £60,000–£102,000 |
| Larger project (42 m²) | £84,000–£143,000 |
| Rate per m² | £2,000–£3,400 |
What moves the price most:
- Lightwells
- Waterproofing system
- Floor lowering and underpinning
- Existing cellar or new excavation
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a basement conversion in March?
Before anything is built in March, we confirm which approvals apply in England. In England converting an existing cellar with no external change usually does not need planning permission. New excavation, lightwells and changes to the front often do, and some councils, particularly in London, have specific basement policies.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
Handled as part of most basement conversions:
- Underpinning or new structure where needed
- Party wall notices
- Lightwells and windows
- Waterproofing design (tanking or cavity drain membrane)
- Building control sign-off
- Electrics, heating and plastering
How long does it take?
Allow 8 to 16 weeks for a cellar conversion; longer for new excavation. Allow time beforehand for drawings and approvals, usually 3 to 5 months.
Building in March
Many towns in the East of England have estates built since the 1970s, where garage conversions and rear extensions are popular.
Our March coverage includes postcode districts PE15, and we also work in nearby places such as Wisbech, Ely and Peterborough.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about basement conversions in March
Do I need party wall agreements?
In England and Wales, excavating near a neighbour’s foundations usually triggers the Party Wall etc. Act 1996.
Does a basement conversion need planning permission?
Converting an existing cellar without changing the outside usually does not. New excavation, lightwells and changes visible from outside usually do.
How do you keep a basement dry?
With a waterproofing system designed to BS 8102, typically a cavity drain membrane with a sump pump, or a tanking system.
How much does a basement conversion cost in March?
In March, a basement conversion typically costs £2,000–£3,400 per m² for converting an existing cellar, including VAT at 20% (standard rate). A typical 30 m² project comes to roughly £60,000–£102,000. Your fixed price depends on the survey and drawings.
How long does a basement conversion take in March?
Typically 8 to 16 weeks for a cellar conversion; longer for new excavation. Design and approvals beforehand usually take 3 to 5 months.
